Projects

Customer
Scope of work
Range
Period
CustomerScope of workRangePeriod
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Transport of excavated material

Carrying out works connected with transport of excavated material from longwalls, mine faces and relinings to holding tanks and large diameter holes in Lubelski Węgiel „Bogdanka” S.A. mine.
02.01.2009 – 31.12.2009
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Rebuilding of R-25 locomotive shed

Carrying out locomotive shed at 960 level:
  • Carrying out 155,0 m of locomotive shed rebuilding
  • Carrying out connection and strengthening with binding joists of intersection with air-heading at 960 level and carrying out 3,5 m of air-heading relining
  • Carrying out protection of locomotive shed chamber head
  • Installation of 52,0 m of strengthening binding joists

21.07.2009 – 21.05.2009
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of 2 sections of 4/385 gallery at 960 level in Bogdanka mining area:
  • Carrying out 153,0 m of relining of 4/385 gallery
  • Strengthening of lining with rails and straight connection pipes binding joists, total length 18,0 m

16.10.2009 – 16.10.2010
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of cross-cut 1 between water galleries at 960 level in Bogdanka mining area, in LW “Bogdanka” S.A. mine:
  • 106,5 m of cross-cut 1, including intersection with water gallery 2,
  • Strengthening of lining over a distance of 24,0 m of cross-cut 1 with two rows of binding joists, supported with SV props.
Work not started yet
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of northern mining cars diversion construction at 960 level in Bogdanka mining area:
  • Carrying out 60 m of relining of northern mining cars diversion construction
  • Strengthening of lining over a distance of 48,0 m with rails and straight connection pipes binding joists
30.11.2009 – 30.09.2010
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Transport of excavated material to holding tanks and large diameter holes.

Carrying out works connected with transport of excavated material from longwalls, mine faces and relinings to holding tanks and large diameter holes in Lubelski Węgiel „Bogdanka” S.A. mine.
02.01.2010 – 31.12.2010
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out services of lining strengthening in dog headings on Bogdanka mining area in Lubelski Węgiel ,,Bogdanka” S.A. mine17.05.2010 – 17.05.2011
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of N Granby and Granby diversion construction sections at 960 level in Bogdanka mining area.24.06.2010 – 24.06.2012
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of 5/I inclined drift section at 960 level in Bogdanka mining area.01.10.2010 – 15.04.2011
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out mining works in field IV, bed 385 – Bogdanka area12.10.2010 – 12.10.2014
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Transport of excavated material to holding tanks and large diameter holes.

Carrying out works connected with transport of excavated material from longwalls, mine faces and relinings to holding tanks and large diameter holes in Lubelski Węgiel „Bogdanka” S.A. mine.
29.12.2010 – 29.12.2012
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Maintenance of transport ways for transport suspended rail train sets.

Carrying out works connected with maintenance of transport ways for transport suspended rail train sets installed in excavations.
10.01.2011 – 10.01.2013
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of 3/IV conveyor road section at 920 level in Bogdanka mining area.05.05.2011 – 10.04.2012
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out relining of excavation section passenger station at 960 level in Bogdanka mining area.29.08.2011 –
Lubelski Węgiel "Bogdanka" S.A. w Bogdance,
21-013 Puchaczów
Carrying out strengthening of dog headings lining in Bogdanka area in Lubelski Wegiel Bogdanka S.A. mine.10.02.2012 – 30.11.2012